How long does it take to launch a RELO micro-factory?

A RELO micro-factory typically launches within 3 to 6 months after signing, covering site planning, permitting, and deployment.

The cold chain,
in your inbox.

Subscribe to our newsletter!

Short reads on cold packs, packaged ice and the rules reshaping temperature-controlled shipping.

  • Cold pack and packaging trends
  • Regulation watch, including EPR
  • What we are building at Relocalize
‍